12/1/2010 Alerion authorised to build a new wind farm in San Marco in Lamis (Foggia) with a power capacity of 72.6 MW
8/1/2010 Internal Dealing
12/11/2009 The Board of Directors of Alerion approves the interim financial results of the Group at 30th September 2009